How it works
One sentence. Six months of work. Four decisions.
The best way to see how Nerva works is to follow one piece of work all the way through: from the sentence that starts it, through the team that builds it, the week it breaks and the month you are away, to the day it closes.
This page shows how Nerva is designed to work. It is in private development, and Where Nerva is today lists what is in the current build.
Ready Nothing is running yet
One Operation, six months, 13 moments.
Follow the line down the page. It runs cyan while Nerva works, turns amber where the work stops for you, and green where something is proven. The notes in mono are what the Operation’s own record says at each point. The person, the service and the figures are made up: this is an illustration of how Nerva is designed to work, and nothing in it ran on a real computer.
01Day 1Asked
You say what you want, once.
Type it or say it, the way you would brief someone you trust. Nerva asks about anything that would change the outcome, and nothing else. It does not need the method spelled out.
You asked
Help me launch a research subscription. Build the customer portal, publish a brief every week, and run it for six months. Use these sources, keep client material separate, stay inside this budget, and bring me anything that commits me to something new.
02Day 1Operation opened
It becomes an Operation.
Work this size leaves the conversation. Nerva opens a workspace for it and an Operation inside: the goal, the limits and what done means, written down where they will still be in six months. You see it happen, and you can correct it.
The Operation
Goala paid weekly research brief, with a portal, run for six months
Limitsyour sources · client material kept apart · your budget · new commitments come to you
Done meansportal live · a brief published every week · every subscriber served
03Week 1A decision for you
The big questions are argued first.
Which readers to serve, which sources hold up, what the first version includes. A Think Tank works them through, a Round Table challenges the options, and a Decision Board lays them out. You get a recommendation with the disagreement left in, and you decide. Once it is settled, it is not argued again every week.
Decision Board
Start with one weekly brief for finance teams, objection noted?
Three of four views agree. One objection stays on the record: the audience may be too narrow.
- If you accept
- The plan is fixed and the build begins.
- If not
- Nothing is built. The options stay open.
Your answers: Accept · Test it first · Not yet
04Week 1Running
A team gets on with it.
Nerva Prime puts the right agents on the work: research, building, editing, checking. Each has its own access, its own budget and its own lane, and they work side by side. You watch the work. You do not manage the workers.
On it
Primeleads the team, and answers to you
Researcherreads your sources and nothing else
Builderthe portal's code, in its own lane
Editorturns findings into the brief
Checkertests what the others claim
05Weeks 1 to 4Running
It works from what you allowed.
Research reads the sources you approved. Client material stays in its own space. Each lane uses a model that suits it and that your rules allow. In week three one of those models is withdrawn. The work moves to another and carries on, with the switch on the record.
What it may use
46 sourceseach one approved by you
Client filesthis workspace only
3 modelschosen by your rules, paid for on your own accounts
Week 3: one model withdrawn (a model was changed)moved to another you allow. Nothing lost.
06Weeks 2 to 5Running
The portal is built, reviewed and tested.
Agents write the code in the Workbench. Every meaningful change is reviewed against what it was for, tests run, and you can open a preview whenever you like. Dozens of small decisions are made here. None of them is yours, so none of them reaches you.
Change review
What changedsign-up, payment, the reader's page
How it was checked184 tests · a working preview
How to undo itrehearsed before release
07Week 5Waiting for you
It reaches something that is yours, and asks.
Going live means a public page in your name and a hosting bill each month. Both are outside the limits you set. So Nerva stops, asks one clear question, shows what each answer leads to, and waits. It does not hurry you, and it does not go round you.
A decision for you
Launch the portal publicly, on the paid hosting plan?
It is public, in your name, and it costs $40 a month. New commitments come to you.
- If you approve
- Nerva deploys, then checks the live site end to end.
- If not
- Nothing goes live. The build stays ready.
Your answers: Approve · Approve with a change · Not yet
08Week 5Proven
Launched means checked live.
A build that passes is not a service that works. After the launch Nerva tries the real thing: a sign-up, a payment, a brief delivered. Guardian, which is independent of the agents that did the work, challenges anything that matters and has not been shown. Each claim gets its own evidence.
What is proven
A reader can sign up and pay (proven)tried on the live site
The first brief reached every subscriber (proven)delivery confirmed by the mail service
It stays healthy (not yet)not yet: week 1 of 21
09Month 2 onwardOn schedule
Then it runs, week after week.
The weekly brief becomes a recurring program, with you as its owner. Looking after the portal becomes another. Every run is a piece of work in its own right, with its own result, and every run checks that it may still run. You set the schedule once. You can pause it or retire it whenever you like.
The weekly brief
Every Monday, 07:00owned by you
Run 4 delivered (proven)12 items · 40 citations
Next run: Mondayit will check first that it still may
10Month 3Recovered
Things go wrong, and it copes.
A source disappears. A provider has a bad afternoon. One Monday the request to publish times out. Nerva does not send it again and hope. It marks the result as not confirmed, finds out whether the brief went out, and only then acts. It had gone out. Nobody received it twice.
On the record
The publish request timed out (a problem)
Result not confirmed. Not sent again. (stopped)
Checked: it had gone out (recovered)
One brief, delivered once (proven)
11Month 4Running
You go away. It carries on.
Three weeks of travel. The programs keep running inside their limits, and only a real decision would have come looking for you. When you are back, a catch-up tells you what happened, in order, at the length you want.
While you were away
3 briefs published
1 source replacedwith one you had already approved
1 dependency updatedtested and released inside your limits
0 decisions waiting
12Month 5Tested
It gets better at the job.
You wonder whether the brief could be tighter. In Discovery Lab, Nerva runs a shorter format beside the usual one for three weeks and shows you what each gained and lost. The shorter one reads faster and misses nothing that mattered, so you adopt it. Nothing changed until you did.
Discovery Lab
Shorter formatread in 4 minutes, not 7
Coveragethe same 12 items
Adopted by you (your decision)
13Month 6Complete
It closes when it is really finished.
Six months are up. Nerva sets what was asked for beside what happened: the portal, twenty-two weekly briefs since the launch, the subscribers served, and what is still open. You decide the weekly brief should carry on, so it does, as a program of its own. The six-month Operation closes, with its record intact.
At the close
Portal live for 21 weeks (proven)
22 of 22 weekly briefs published, each once (proven)
2 refund requests still open (not yet)carried forward, with an owner
Decisions brought to you in six months: 4 (your decision)
Closed. What it claimed is proven.
That is the whole line. Six months of work, 4 decisions that were yours to make, and a record that says what happened, including the two things still open.
What it used
14 parts of Nerva were in that story.
None of them was a separate tool bolted on. That is the point: the plan, the team, the code, the schedule, the failure and the proof all belonged to one Operation.
It was one person’s work, so it did not call on all of Nerva. The parts it left alone are listed last.
Hand it the whole thing. Keep the decisions.
Nerva is in private development. Ask for founding access and we will tell you when your window opens.
